Opening thirty locations this year is not thirty small IT projects. It's one program that has to produce the same result thirty times, in thirty markets, against dates set by a construction schedule you don't control.

We run that program. Averlyn Tech takes ownership of the full deployment scope — survey, procurement, staging, cabling, network build, equipment installation, testing, and closeout — and delivers it site by site against your calendar.

The work starts with a single site standard developed with your team. Once it's approved, it becomes the build document for every location: the same equipment, the same cabling spec, the same network configuration, the same labelling, the same closeout package. A technician walking into your Surrey location and one walking into your Moncton location are building the identical site.

Coordinating that across the country is the part most vendors underestimate. Permitting timelines differ by municipality. Low-voltage licensing requirements differ by province. Freight into the Maritimes, Northern Ontario, or the territories has to be planned weeks earlier than freight into the GTA. We build those realities into the schedule at the start, rather than discovering them at site eighteen.

You get one project manager, a site-by-site schedule, and status reporting that tells you exactly where each location stands. When a general contractor pushes a date — and one always does — we resequence around it and tell you what it means for the rest of the program.

What's included

  • Site surveys and pre-construction coordination
  • Site standard development and documentation
  • Permitting and inspection coordination by jurisdiction
  • Equipment procurement, staging, and configuration
  • Structured cabling and low-voltage installation
  • Network deployment and cutover
  • POS, kiosk, digital signage, and peripheral installation
  • On-site testing, certification, and punch list resolution
  • As-built documentation and asset registration
  • Post-opening support handoff

Predictable dates

Sites open when the calendar says they open, because the schedule is built around your construction timeline, not ours.

Identical sites

Every location built to the same document — which means every location can be supported the same way afterward.

One point of contact

A named project manager who knows every site in your program and answers for all of them.

Not sure which of these you need?

Most of our clients start with one service line and expand. Send us your footprint and your current setup, and we'll tell you honestly where the gaps are.